Completion Year: 2018
Gross Area of the Entire Development: Over 90,000 sqm
Hong Kong/ PRC
The Hong Kong-Zhuhai-Macao Bridge is a mega-size sea crossing linking Hong Kong, Zhuhai and Macao. It is the largest bridge-tunnel and sea-crossing system in the world.
The Passenger Clearance Building (PCB) is the landmark of HZMB HKP, it houses the customs, immigration and quarantine facilities for passengers accessing Hong Kong via the HZMB. The PCB is a two-storey building with a total floor area of over 90,000 square metres for Arrival Hall on the ground floor and Departure Hall on the first floor. Tthe PCB is an energy efficient and environmentally friendly infrastructure.
- The project employed automated and intelligent lighting control system in the office areas.
- The lighting control system is fully integrated with the buidling management system and the audiovisual control system.
- Both the normal lighting and battery-powered emergency lighting were controlled and monitored by the Envision Manager software.
- The government-controlled duration test and emergency lighting function test can be performed with the Envision Manager software, saving on the labor of the building managers.